India Datacenter Watch Curated by Dr. Vasundhara Sen

Updated

Method

How we count

Filings against announcements

The same build-out, measured two ways. A filing is what a developer asked the grid for: the whole site’s draw, including cooling and room to grow. Announced IT load is what companies say their servers will use. So filings can run well ahead of announcements without either being wrong.

ProjectFilingsAnnounced IT MWFiled MWGranted MW

The wider market

This tracker follows the largest public projects. These figures describe the whole Indian market and grid, from market reports, government statements and some secondary summaries (each entry names its source and how good it is), so the tracked projects can be read against them. They measure different things and are not added to any tracker total.

Estimates of India’s capacity, newest first

Where analysts expect it to go

Forecasts of total data-centre capacity across India, for every kind of use, AI included.

The grid it plugs into

When the power is due

By the end ofGranted MWDated by the register, MWIncluding estimated dates, MW

The register

Transmission

A grant is only useful if the lines and substations to carry the power get built. These are the transmission packages the filings depend on.